Skip to main content

Structured cabling • Pallekele

Structured Cabling in Pallekele

Tidy, tested cabling every system can rely on.

Cat6 and fibre runs, patch panels and racks — labelled, tested and documented at handover.

  • Free site visitWithin our service areaනොමිලේ පැමිණ බලනවා
  • Written quote before work startsවැඩට පෙර ලිඛිත මිල ගණන්
  • Warranty on installationsTerms vary by equipmentසෑම වැඩකටම වොරන්ටි
Google rating
4.9Google rating
years in Kandy
10+years in Kandy
systems installed, all services
500+systems installed, all services
towns served
29towns served

Prefer a call?

Leave your details and we'll discuss your cabling requirements.

Enquiry forStructured Cabling

Used only to reply to this enquiry. Privacy policy

Factory offices, warehouse admin blocks, and new commercial fit-outs around the Pallekele zone need clean, tested, and properly certified cabling before equipment and workstations go in. We handle the full process — cable routing, termination, testing, and as-built documentation — with Cat6 as the standard for offices and Cat6a reserved for server rooms and backbone runs between buildings, which industrial sites often need across separate structures. Proper labelling and certification matter especially on larger sites where whoever manages the network next shouldn't have to guess which cable goes where. We plan runs around the structural realities of production buildings during the survey rather than after work has started.

What we plan for in Pallekele

  • Warehouses with high racking and forklift traffic need cable kept well above vehicle height or inside steel conduit at floor level, so a reversing forklift cannot tear out a data point.
  • Big factory buildings can put desks and machines beyond the 90-metre copper limit from one comms room, so extra floor cabinets or fibre to intermediate switches keep every run within specification.
  • Sites in the zone often expand in phases, so trays and cabinets are sized with spare capacity and extra fibre cores, allowing a new production line to connect later without re-pulling the backbone.

Scope

What structured cabling includes

  • Cat5e, Cat6, and Cat6a cabling
  • Fibre optic installation
  • Patch panel and rack setup
  • Cable management and labelling
  • Testing and certification
  • Floor and ceiling trunking
  • Server room setup
  • As-built documentation

How it works

From enquiry to handover, in three steps

01

Site survey

We walk the building, plan cable routes, and count the data points needed per room.

02

Written quote

An itemised quote covering cable, containment, patch panels, and testing/certification.

03

Install & certify

We terminate, label, and test every run, and hand over as-built documentation.

Pricing

What changes the price

Every job is different, so we quote in writing after a free survey — not off a fixed price list. These are the main factors:

  1. 1Number of data points needed
  2. 2Cat6 vs. Cat6a vs. fibre backbone
  3. 3Floor and ceiling trunking / cable management
  4. 4Testing and certification requirements

FAQ

Structured Cabling in Pallekele — questions

Standard office cable and faceplates are fine in admin blocks, but production areas often need industrial-rated connectors, sealed outlets and cable jackets that tolerate heat, oil or chemicals. Runs close to motors or welding equipment may need shielded cable. Each area is looked at for what actually happens there before products are specified, rather than using one type across the whole site.

You do. At handover you receive the labelling scheme, test results for every link and drawings showing where each cable runs, all in digital form. These records belong to the site, so any future IT provider can work from them. If more points are added later, the documents are updated to match what is actually installed.

Cat5e is the budget option and fine for basic needs; Cat6 is the sensible default for most modern offices; and Cat6a supports 10-gigabit speeds, worth it for server rooms and backbone runs but rarely necessary for individual desks. For most offices we run Cat6 to workstations and Cat6a only on the backbone.

We recommend two data points per desk — one for a computer and one spare for a phone, printer, or future need — rather than exactly one per person. Retrofitting a single missed point after the finishes are complete costs far more than including it upfront.

Cabling during construction, before walls close up, is significantly cheaper per point than retrofitting into a finished space, where cables must be routed around existing finishes. If you're planning a new fit-out, involve your cabling provider at the same stage as your electrician.

Yes. Every structured cabling installation includes termination, testing, and certification documentation. Untested cabling can look fine on day one and cause intermittent faults months later that are far more expensive to diagnose — so certification is standard, not an optional extra.

For a typical 20-person office in the Kandy area, professional structured cabling runs between LKR 150,000 and LKR 300,000 depending on cable type and layout complexity, including data points at each workstation, patch panels, a network cabinet, and testing certification. We provide a detailed quotation after a free site survey.

10+

Years in Kandy

500+

Systems installed

4.9★

110+ reviews

1yr+

Warranty

Trusted Brands We Work With

Hikvision logo
Dahua logo
EZVIZ logo
Xiaomi logo
TP-Link logo
Cisco logo
D-Link logo
Kelani Cables logo
Seagate logo
Western Digital logo
Hikvision logo
Dahua logo
EZVIZ logo
Xiaomi logo
TP-Link logo
Cisco logo
D-Link logo
Kelani Cables logo
Seagate logo
Western Digital logo

Book a free structured cabling survey in Pallekele

Professional structured cabling for homes and businesses in Pallekele, Sri Lanka — free site survey, written quote, no obligation.